Toromont Energy Systems gas processing plant. Built in 2009. Operating in Cambridge, Ohio. Consisting of 3 cold weather insulated and heated skid mounted buildings:
Building #1: Wagner Power Systems 480 Volt -301KW Dual Fuel Generator with 425 BHP Caterpillar G3408TA engine, Champion Industrial 2 BHP air compressor pneumatic controls system for all 3 buildings.
Building #2: Ariel JGA2 two stage natural gas compressor with 125 BHP EMD @ 1200 RPM electric motor, Inlet Scrubber, Interstage Scrubber, 1st and 2nd stage Coolers, 800 psig Discharge Separator and Allen Bradley PLC that controls the gas plant.
Building #3: 450+ MCFD MRU with Copeland refrigeration 3-phase electric compressor, gas chiller, gas/gas exchanger, gas liquid exchanger, 725# 3-phase cold separator, 8″ x 35′ NGL stabilizer tower with 24″ x 3′ electric reboiler, methanol injection pump, inlet 3-phase 800 psig separator and fuel gas scrubber.
P & ID Drawings and Allen Bradley PLC Program.