165GPM Amine Plant For Sale

$1,400,000.00

Report problem
Processing your request, Please wait....

Additional Info

State/ProvinceOK
CountryUnited States
ShippingBuyer pays
Allow DealsYes
I Want ToSell
Telephone Number318 426-8509
Email Addresskevin.smith@enablemidstream.com

Notes

We can be contacted M-F 8 TO 5.
Will be shown by appointment

Jacob Speight is another contact.
email Jacob.speight@enablemidstream.com

phone # 318 207-2375

We had a amine processing plant built and have only used the dehy portion, which we plan to keep.
Exterran did a capacity study in 2019.
The report is available if interested.

Per our Process Engineer.
The process run was made with a 48 MMSCFD, @ 900 PSIG. I am assuming this is towards the top end of the range. But without seeing the customer’s expected gas composition, pressure, and temperature that is as close of a value we can give them.

• 55 MMSCFD
• 1.7% Mole Inlet CO2
• 165 amine circulation
• 900 PSIG Inlet (the tower is rated higher, but I used this for my calculations)

Buyer will be responsible for all disassembly, crane and transportation cost.

The dehy is currently in operation, and will need to be intact and operational.

Comments